acf
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home5/trisoft/test.pitcopk.com/wp-includes/functions.php on line 6121Avada
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home5/trisoft/test.pitcopk.com/wp-includes/functions.php on line 6121From July 2006 to November 2006, PITCO, in collaboration with Fichtner GmbH & Co. KG, provided technical assistance for a co-generation power plant project at Pak Arab Fertilizer in Multan, Pakistan. The project involved reviewing existing concepts, optimizing them, and providing assistance in revising tender specifications based on the optimized concepts.<\/p>\n
PITCO\u2019s services included assisting in the revision of the concept study, preparing recommendations for optimizing the concept study, and revising and modifying tender specifications. Our team ensured that the co-generation power plant project was designed and implemented according to optimized concepts and technical specifications, supporting Pak Arab Fertilizer\u2019s power generation optimization efforts.<\/p>\n","protected":false},"excerpt":{"rendered":"
From July 2006 to November 2006, PITCO, in collaboration with […]<\/p>\n","protected":false},"author":1,"featured_media":5084,"menu_order":103,"comment_status":"closed","ping_status":"closed","template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"portfolio_category":[458,42],"portfolio_skills":[],"portfolio_tags":[64,474,659,136,220,97,658,296,63],"class_list":["post-3672","avada_portfolio","type-avada_portfolio","status-publish","format-standard","has-post-thumbnail","hentry","portfolio_category-feasibility-studies","portfolio_category-power-generation","portfolio_tags-assistance","portfolio_tags-co-generation","portfolio_tags-feasibility-studies","portfolio_tags-for","portfolio_tags-plant","portfolio_tags-power","portfolio_tags-power-generation","portfolio_tags-project","portfolio_tags-technical"],"acf":[],"_links":{"self":[{"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/avada_portfolio\/3672","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/avada_portfolio"}],"about":[{"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/types\/avada_portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/comments?post=3672"}],"version-history":[{"count":1,"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/avada_portfolio\/3672\/revisions"}],"predecessor-version":[{"id":3673,"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/avada_portfolio\/3672\/revisions\/3673"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/media\/5084"}],"wp:attachment":[{"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/media?parent=3672"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/portfolio_category?post=3672"},{"taxonomy":"portfolio_skills","embeddable":true,"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/portfolio_skills?post=3672"},{"taxonomy":"portfolio_tags","embeddable":true,"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/portfolio_tags?post=3672"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}