acf
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home5/trisoft/test.pitcopk.com/wp-includes/functions.php on line 6121Avada
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home5/trisoft/test.pitcopk.com/wp-includes/functions.php on line 6121From July 2015 to March 2017, PITCO served as the Owner\u2019s Engineer for the 40 MW Coal-Fired Power Plant at Maple Leaf Cement Factory in Daud Kheil, Mianwali, Pakistan. The project involved preparing project documents, reviewing designs, and monitoring construction. The scope included the complete power plant, covering boiler package, steam turbine, balance of plant (BOP), electrical, instrumentation and control (I&C), and HVAC systems.<\/p>\n
PITCO’s services included finalizing the contractor\u2019s scope of work, assisting in pre-award clarification meetings, contract administration, and reviewing the contractor\u2019s design drawings and documents. PITCO also monitored equipment manufacturing, supervised construction, and conducted commissioning and performance tests. The project aimed to enhance energy efficiency and reliability at the Maple Leaf Cement Factory.<\/p>\n","protected":false},"excerpt":{"rendered":"
From July 2015 to March 2017, PITCO served as the […]<\/p>\n","protected":false},"author":1,"featured_media":5068,"menu_order":3,"comment_status":"closed","ping_status":"closed","template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"portfolio_category":[380,42],"portfolio_skills":[],"portfolio_tags":[440,383,136,258,441,273,382,97,144],"class_list":["post-3642","avada_portfolio","type-avada_portfolio","status-publish","format-standard","has-post-thumbnail","hentry","portfolio_category-owners-engineer-services","portfolio_category-power-generation","portfolio_tags-coal-fired","portfolio_tags-engineer","portfolio_tags-for","portfolio_tags-in","portfolio_tags-mianwali","portfolio_tags-mw","portfolio_tags-owners","portfolio_tags-power","portfolio_tags-services"],"acf":[],"_links":{"self":[{"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/avada_portfolio\/3642","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/avada_portfolio"}],"about":[{"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/types\/avada_portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/comments?post=3642"}],"version-history":[{"count":1,"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/avada_portfolio\/3642\/revisions"}],"predecessor-version":[{"id":3643,"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/avada_portfolio\/3642\/revisions\/3643"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/media\/5068"}],"wp:attachment":[{"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/media?parent=3642"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/portfolio_category?post=3642"},{"taxonomy":"portfolio_skills","embeddable":true,"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/portfolio_skills?post=3642"},{"taxonomy":"portfolio_tags","embeddable":true,"href":"https:\/\/test.pitcopk.com\/wp-json\/wp\/v2\/portfolio_tags?post=3642"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}