Client:
Pak Arab Fertilizer (Private) Limited
From July 2006 to November 2006, PITCO, in collaboration with Fichtner GmbH & Co. KG, provided technical assistance for a co-generation power plant project at Pak Arab Fertilizer in Multan, Pakistan. The project involved reviewing existing concepts, optimizing them, and providing assistance in revising tender specifications based on the optimized concepts.
PITCO’s services included assisting in the revision of the concept study, preparing recommendations for optimizing the concept study, and revising and modifying tender specifications. Our team ensured that the co-generation power plant project was designed and implemented according to optimized concepts and technical specifications, supporting Pak Arab Fertilizer’s power generation optimization efforts.