Client:
K-Electric (KE)
From August 2016 to November 2017, PITCO provided technical assistance to K-Electric for the installation of Arial Bundled Conductor (ABC) in Karachi, Pakistan. The project involved reconnecting service drops of existing energy meters to the newly installed ABC and removing existing LT lines, aiming to enhance the efficiency and reliability of the electricity distribution system.
The services included preparing staking sheets for construction units, BOQs, selecting contractors, and supervising their work as per approved drawings. Our team ensured proper sagging and tying of all-insulated ABC, monitored construction and delivery schedules, and supervised the satisfactory operation of the LT network. Day-to-day progress monitoring and preparation of monthly progress reports were also integral parts of the services provided.