Client:
Pakhtunkhwa Energy Development Organisation (PEDO)
From July 2017 to March 2020, PITCO, in collaboration with Fichtner GmbH & Co. KG, conducted a comprehensive feasibility study for the 150 MW Sharmai Hydropower Plant in Khyber Pakhtunkhwa, Pakistan. The project, funded by Sapphire Electric Company Ltd., aimed to perform a full technical, financial, economic, environmental, and social feasibility study for the hydropower plant and its interconnection/transmission lines. The study included site visits, data collection, preliminary planning, design studies, and preparation of EPC tender documents.
PITCO’s services included assisting in the preparation of a bankable feasibility study report, reviewing environmental and social safeguard studies, and preparing the Resettlement Action Plan. Our team conducted site visits, data collection, and preliminary planning and data analysis. PITCO also provided assistance in project planning and design studies, site reconnaissance and field visits, and preparation of EPC tender documents. The feasibility study aimed to ensure the sustainable and efficient development of the Sharmai Hydropower Plant.