Client:

International Finance Corporation (IFC)

From December 2018 to July 2019, PITCO, in collaboration with DESL, conducted an energy audit of the thermal power plant at Sapphire Finishing Mills Ltd. (Apparel Division) in Lahore, Pakistan. The project, funded by IFC, aimed to optimize thermal operations, including steam and hot water systems, heat recovery systems, and other related components. The audit was conducted to ascertain direct and indirect combustion efficiencies with the intent to enhance operational efficiency.

The services provided included a pre-assessment questionnaire, on-site surveys, data collection to ascertain design parameters, baseline conditions assessment, and evaluation of fuel quality and generation efficiency. Our team also assessed energy consumption, organized workshops to train factory personnel, and developed detailed energy audit reports. The audit identified opportunities for optimizing thermal operations and improving overall plant efficiency.

Share This Story, Choose Your Platform!